Freelance programmer: bharat kumar


Here is the list of freelance programmers you can contact when you have some programming offers. You can register yourself by clicking the link below.
Registration is free, but your request has to be approved.

 Regiter as Freelance Developer
Display your skills and contact details on a public profile and receive new freelance project requests by email

 Submit a project request for free !
If you're looking for skilled freelance developer, to complete a freelance project for you
you can contact all of the listed freelancers by this form.


 Work on open freelance projects
Choose a submitted project and contact the author

 List of all freelance developers
Shows the list of developers available to work on your projects.

Search:


programmers name: bharat kumar
skills: Hardware skills
city, country:noida
freelance experiences:Hi , I am Bharat kumar ,having 4+ yrs of experience in SAP-ABAP/PI as a Technical consultant working in HCL Technologies Pvt Ltd , Noida.Having Exposure in SD,MM,IS-U Modules and also having exposure of adavance tool SAP-PI .Please find the attachement of my CV & Let me know if my profile suites to your requirement . Thanks & Regards, Bharat Kumar Ch. SAP-ABAP / PI Tech.Consultant
projects:SAP R/3 Work Experience in HCL Technologies Ltd
From To
Sep 2008 Till Date SAP Support

Client HCL Technologies Ltd - PF Trust Accounting systems,Noida
Team Size 6
Roles Team Member
• Understanding the client requirement
• Analysis and development of objects as per client requirement.
• Performance tuning for all custom developed objects.
• Background jobs has been scheduled and monitored for the Reports and BDC programs.
• Production support and review background jobs execution.
• To perform the unit testing of the functionality of applications and to develop component test plan with test data results and to ensure that the developed program related issues.

Project Details The most basic and vital functions of the PF trust accounting system. It captures the monthly PF contributions after the salary have been processed by the salary departments of the corresponding divisions enrolled with the PF Trust. This function captures the bulk of data that the PF Trust maintains and periodically processes and in effect happens to be the very essence of the PF Trust Accounting System.
Activities • Developed a Dormant Account Report to get the list of dormant account employee's who have not contributed in EPF for present fiscal year & previous fiscal year for MIS reporting.
• Modified the TDS calculation sheet Report, to calculate TDS in system by using a calculator which already exists in the system
• Modified the Interest Calculation report which already exist in system but it does not cater the need of current month on month closing scenario so it has been enhanced in order to give accurate output at any given point of time.
• Modified the Report for 7PS & 8PS statement, system should not take the list of the employees whose contribution is nil for that fiscal year.
• Scheduled a Background job's :
PF Data Capture Report (uploads the Employee details into the Employee's Master Data).

Applications worked on during this period Software: SAP PI 7.0


SAP R/3 Work Experience in HCL Technologies Ltd
From To
Jan 2009 Feb 2009 SAP Heterogeneous Systems Integration

Client HCL Technologies Ltd,Noida
Team Size 2
Roles SAP XI Consultant
• Developed the Design Configuration of objects
• Configuring IDOC Adapter in XI to transport IDOC to R/3 module
• Configuring RFC adapter and SOAP adapter in XI
• Creating the development objects for mappings using GUI.
• Configuring File adapter in XI to transport data from legacy system.
• Configuring JDBC adapter in XI to transport data from legacy system to SQL Server.
Project Details This project is an in-house development for building a proof of concept to heterogeneous systems integration using SAP NetWeaver XI as solution for the requirements. The project is build to implement one common integration platform. In which transportation mechanism of legacy data (Vendor) over to SAP R/3 via IDoc, Purchase order data to FILE through IDOC has been developed and legacy data to Oracle via JDBC. Here XI is intended as a central Hub for various applications and backend.

Applications worked on during this period Software: SAP PI 7.0

















SAP R/3 Work Experience in HCL Technologies Ltd
From To
April 2008 Sep'2008 SAP IS-U Implementation Project
Client TUAS POWER LTD, Singapore(On-site)
Team Size 15
Roles Team Member

• Providing the value support to the client in terms of quality deliverables and built the strong knowledge of client systems.
• Analysing Functional Specifications and get clarifications from Business analysts.
• Co-ordinate with Functional consultants to understand the specified requirements.
• Development, fine-tuning & Modifications of custom objects.
• Development and Modifications of Online Interfaces and BDC programs.
• Uploading data to SAP IS-U system through EMIGALL tool.
Project Details Tuas Power Ltd is a major player in Singapore’s electricity industry. Established in 1995, Tuas Power owns businesses in electricity generation, trading and retail as well as the development and provision of multi-utilities and its related services.

Tuas Power Supply Pte Ltd (TPS) specialises in providing electricity solutions that help businesses manage the risks associated with purchasing electricity in Singapore’s liberalised electricity market. Currently serving more than 20 per cent of contestable consumers in Singapore, TPS’s competitive edge is in understanding customers’ unique needs and developing customised electricity solutions for their businesses. TPS’s key strengths are in the Small and Medium Enterprise (SME) and multi-tenanted segments.
Activities • Developed an Interface to maintain Global exception period. This interface will read an input file from Workstation .After validating the Input file it Uploads the global exception periods from excell file and updates the database table Global Exception Periods. During the upload of global exception periods, the periods are checked if it is overlapping with the previous uploaded periods. User will be provided two options to upload the global exception periods into SAP-ISU system.
1. Upload Global exception periods via File
2. Maintain the Global exception period in a custom table

• Developed an Interface upload the half hourly consumption values to the respective interval meter. The interface will read the half-hourly consumption data files from the Application server to upload monthly meter readings for Tenant Accounts will work using the .CSV file.

• Developed a report to Copy Model 2 Tenant’s consumption into EDM for Landlord’s billing. This development is meant only for Model 2 customers, where the bills for the Landlords are produced based on Landlords’ net electricity consumption i.e. after subtracting their respective Tenants’ consumptions from the entire premise’s consumption.

• Uploaded data to SAP IS-U system through EMGALL tool for DM-Premise, Device, and Installation.


languages:english
can't find a contact?
here it is:

< Ricardo Prabhas Gupte >

Latest News

Get the latest freelance project announcements
Follow CodeGravity.com

Download ExtraWatch™

ExtraWatch™ FREE is Joomla, Wordpress, Prestashop, Magento plugin with following features: Live Stats, Nightly Email Reports, Goals, Graphs, Anti-spam, History and more